The Mountain Path Academy
← FundamentalsCapital budgeting hub →

FUNDAMENTALS · APPLIED FINANCE

Cost of Capital & Project Financing

Match project risk with discount rates and separate financing effects.

Prof. V. Ravichandran · The Mountain Path Academy
Formula, numerical illustration and Excel approach

THE MOUNTAIN PATH ACADEMY

Invest today. Evaluate future value.

01 · BUILD THE CASH FLOWS

What changes?

Initial outlay, operating flows, working capital, taxes and terminal proceeds.

02 · MEASURE VALUE

What is it worth?

NPV, returns, recovery, alternatives and capital constraints.

03 · TEST THE DECISION

What could change?

Risk, flexibility, financing, inflation and currency.

Each illustration connects the financial formula with Excel cells, calculation steps and interpretation.

CAPITAL BUDGETING · FORMULA AND EXCEL

1. Match the discount rate to the cash flow

Cash flowDiscount rate / approachTypical use
Unlevered project FCFFProject-risk-consistent WACCRelatively stable target leverage
Equity cash flow after debt flowsProject cost of equityValue to equity holders
Unlevered operating cash flowUnlevered required return, then APV adjustmentsFinancing effects valued separately
Certainty-equivalent cash flowRisk-free rate appropriate to timing/currencyRisk adjustment made in cash flows

The corporate WACC is suitable only when the project has comparable operating risk and consistent financing assumptions. A firm moving into a very different industry should estimate that activity’s risk rather than apply its existing average hurdle blindly.

Continue with Cost of Capital for a broader treatment of financing components.

CAPITAL BUDGETING · FORMULA AND EXCEL

2. Weighted average cost of capital

WACC = E/(D+E) × ke + D/(D+E) × kd(1−T)

Assume market-value weights E = 60%, D = 40%, cost of equity 14%, debt cost 8% and a usable marginal interest tax shield at 25%. WACC = 0.6 × 14% + 0.4 × 8% × 75% = 10.8%.

Reproduce it in Excel

Use a separate worksheet for this illustration.

Cell / rangeEnter / formulaMeaning
B20.6Equity weight
B30.4Debt weight
B40.14Cost of equity
B50.08Pre-tax cost of debt
B60.25Applicable tax rate
B8=B2*B4+B3*B5*(1-B6)WACC = 10.8%
B9=B2+B3Weight check = 1

Use target market-value financing weights and marginal costs, not simply historic book costs. Interest deductibility limits, losses, changing leverage and distress can require more detailed modelling. A WACC tax adjustment assumes the shield can actually be realised.

CAPITAL BUDGETING · FORMULA AND EXCEL

3. Pure play: estimate project operating risk

βU = βL / [1 + (1−T)(D/E)]
βL,target = βU[1 + (1−T)(D/E)target]
ke = rf + βL,target × ERP

A comparable focused business has levered equity beta 1.375, D/E = 0.5 and tax rate 25%. Unlevered beta = 1.375/1.375 = 1.00. For target D/E = 0.8, relevered beta = 1 × (1 + 0.75 × 0.8) = 1.60.

With risk-free 6% and equity risk premium 6%, cost of equity = 15.6%. Debt cost 8% and target weights E = 1/1.8, D = 0.8/1.8 give WACC = 11.33%.

Reproduce it in Excel

Use a separate worksheet for this illustration.

Cell / rangeEnter / formulaMeaning
B21.375Comparable levered beta
B30.5Comparable D/E
B40.25Tax rate
B50.8Target D/E
B60.06Risk-free rate
B70.06Equity risk premium
B80.08Target debt cost
B10=B2/(1+(1-B4)*B3)Unlevered beta
B11=B10*(1+(1-B4)*B5)Relevered project beta
B12=B6+B11*B7Project equity cost
B13=(B12+B5*B8*(1-B4))/(1+B5)Project WACC

This simplified relevering assumes negligible debt beta and a standard treatment of tax shields. In practice examine several comparable businesses, remove surplus-cash effects where relevant, use consistent operating exposures and judge estimation noise. A comparable’s equity beta is not automatically a project asset beta.

CAPITAL BUDGETING · FORMULA AND EXCEL

4. Adjusted present value: separate operating and financing value

APV = unlevered project NPV + PV(financing benefits) − PV(financing costs)

A separate project costs 100 and generates unlevered operating cash flows of 45 at the end of each of three years. Unlevered required return is 10%. Unlevered NPV = −100 + 45 × 2.486852 = 11.9083.

A fixed debt amount of 40 remains outstanding for three years at 6%, repaid at maturity. If interest is deductible at 25%, annual shield = 40 × 6% × 25% = 0.60. Assume its risk warrants a 6% discount rate and shields are fully usable. Shield PV = 1.6038. A net financing fee of 2 is paid today. APV = 11.9083 + 1.6038 − 2 = 11.5121.

Reproduce it in Excel

Use a separate worksheet for this illustration.

Cell / rangeEnter / formulaMeaning
B2100Initial investment
B345Annual unlevered cash flow
B43Years
B50.1Unlevered required return
B640Fixed debt outstanding
B70.06Debt cost
B80.25Tax rate
B90.06Assumed shield discount rate
B102Net financing fee at time zero
B12=-B2+B3*(1-(1+B5)^(-B4))/B5Unlevered NPV
B13=B6*B7*B8Annual interest shield
B14=B13*(1-(1+B9)^(-B4))/B9Shield PV
B15=B12+B14-B10APV

Debt drawdown and repayment are financing cash flows; borrowing is not itself value creation. Value comes from net financing benefits or costs relative to fair financing. Shield discounting depends on the debt policy and risk. Discounting at debt cost here is a stated assumption, not a universal rule.

CAPITAL BUDGETING · FORMULA AND EXCEL

5. WACC versus APV: choose a coherent model

IssueWACC routeAPV route
Operating cash flowBefore interest and debt repaymentBefore financing effects
Interest tax benefitTypically embedded in the after-tax rateAdded separately as shield PV
Financing policyOften target leverage maintainedCan handle a specified debt schedule explicitly
Fees and subsidiesMust be included consistentlyExplicit separate PV adjustments
Main dangerUsing a rate inconsistent with project risk/leverageDouble-counting financing benefits or overstating shields

Both approaches should reconcile when operating assumptions, financing policy, tax shields and risk treatment are consistent. Different answers from independent assumptions do not prove one method is wrong. A project with changing debt may require period-specific rates or a detailed APV.

CAPITAL BUDGETING · FORMULA AND EXCEL

6. A practical investment recommendation

A useful recommendation states the business alternative, incremental cash-flow basis, investment size, NPV, relevant return and recovery metrics, key assumptions, downside tests, financing assumptions and the management decisions that remain. Include ownership of implementation and a post-completion review date.

Before approval

  1. Reconcile initial, operating and terminal flows, including working-capital timing.
  2. Check units, dates, taxes, inflation, currency and financing consistency.
  3. Use NPV to assess value and the other metrics to explain the trade-offs.
  4. Test the main drivers and any constraints or options that change the choice.
  5. Record what evidence could trigger delay, redesign, expansion or abandonment.
Can interest be deducted from OCF while also using an after-tax WACC?

That generally mixes financing and operating valuations and can double-count financing effects. Match FCFF with WACC, FCFE with equity cost, or use APV consistently.

Should every division use the same hurdle rate?

Only when operating risk and financing assumptions justify it. A common rate can overinvest in risky projects and reject relatively safe ones.

Sources and further reading

Selected relevant sections of the supplied materials informed this series. Prasanna Chandra’s planning framework also informs the emphasis on estimation and strategic fit. These are original explanations and teaching cases, not reproduced textbook examples.

  • Prasanna Chandra (2019), Projects: Planning, Analysis, Selection, Financing, Implementation, and Review, 9th edition, McGraw Hill. The uploaded 150-page scan was visually checked in selected opening sections: importance and difficulties of capital investment, project categories, planning–analysis–selection–financing–implementation–review, strategy and demand forecasting. It ends during Chapter 4; later detailed appraisal chapters appear in its contents but are not present in this extract.
  • Dayananda, Irons, Harrison, Herbohn and Rowland (2002), Capital Budgeting: Financial Appraisal of Investment Projects, Cambridge University Press. Reviewed selected passages on relevant cash flows, appraisal methods, sensitivity, simulation and capital constraints. The chapter structure also guides further reading.
  • Dr. Vijay Shankar Pandey, Capital Budgeting Techniques, uploaded as “Basics of Capital Budgetings”: process, payback, ARR, NPV, IRR and comparison. Rounded examples and conventions are checked independently rather than copied.
  • Professor James P. Dow Jr., FIN 303, Part 8: Topics in Capital Budgeting: uncertainty, flexibility and unequal project lives.
  • Capital Budgeting – Risk Analysis, uploaded five-page extract: probability, certainty equivalents and risk-adjusted approaches.

For continued study: Dayananda Chapters 1–2 for foundations; 5–6 for appraisal; 7–9 for risk; 11–12 for constrained selection; 16 for international appraisal. Review here is targeted, not a claim that the entire 343-page book was read.

Prasanna Chandra: further-reading map

The 9th-edition contents identifies Chapter 8 (Investment Criteria), Chapter 9 (Project Cash Flows), Chapter 10 (Cost of Capital), Chapter 11 (Project Risk Analysis), Chapter 12 (Project Rate of Return) and Chapter 13 (Special Decision Situations). These are reading directions, not claims that their absent pages were consulted.

Public reference links

All rates, taxes, exchange rates and business figures in the examples are teaching assumptions. Results use unrounded calculations and are rounded for display. Excel formulas use English function names and commas.

Continue the learning path