1. Facility and classification
indicative standard rate
2. Forward-looking scenarios
| Scenario | Weight % | Year-1 PD % | Year-2+ marginal PD % | LGD % |
|---|
Three scenarios are an illustration, not a fixed RBI count. The 0.03% regulatory 12-month PD minimum is applied to Year-1 PD. Weights are used as entered and must total 100%.
Provision result
Scenario losses (unweighted, discounted at EIR)
Rule for one category/stage pool: required = max(model ECL, floor). Apply separately to each product category and stage for Stages 1–2; Stage 3 is account-level. Additional specific provisions are not modelled.
Income recognition
Lifetime cash-flow view
| Year | EAD (₹ cr) | Weighted marginal PD | Discount factor | PV loss (₹ cr) |
|---|
Year-end default timing and a common EAD profile across scenarios. Stage 1 uses Year 1 only; Stage 3 uses PD = 100% with scenario LGDs that should already reflect discounted recoveries.
Bank-wide transition on 1 April 2027
Edit the loan book. The tool compares provisions held under IRACP on 31 March 2027 with opening ECL, then applies the optional CET1 add-back of the positive difference net of tax: 4/5, 3/5, 2/5 and 1/5 of it in FY 2027–28 to FY 2030–31 (para 108), ending 31 March 2031.
Model rates use each category’s scenario PDs and LGDs (20/55/25 weights). Stage 1 = 12-month PD × LGD; Stage 2 = that loss × the lifetime multiple; Stage 3 = weighted LGD. Each is then raised to the RBI floor for that category and stage. All are teaching assumptions, not a bank’s validated model.
Loan book by category and stage ₹ crore
| Category | Funded | Stage 1 % | Stage 2 % | Stage 3 % | IRACP held | Opening ECL | Change |
|---|
Stage 1 % fills itself so the three stages total 100%.
CET1 glide path (optional relief)
| Financial year | Maximum add-back | Add-back (₹ cr) | Net deduction from CET1 (₹ cr) | Impact (bps) | Transitional CET1 |
|---|
Full ECL provisions are held from 1 April 2027; only regulatory capital is phased. A bank may finish sooner. The add-back is not Tier 2 and does not reduce the leverage-ratio exposure. RWA and earnings are held constant. Disclose transitional and fully loaded ratios.
Prudential floors: Stages 1 and 2 (para 82)
| Item | Product category | Existing IRACP* | Stage 1 | Stage 2 | Stage 2 vs existing | Stage 3 table |
|---|
*Existing IRACP column: indicative standard-asset rates under the 2025 regime, for comparison only. Floors are minimum provisions on the exposure base, not PDs.
Stage 3 floors: secured / unsecured portion (%)
| Time in Stage 3 | A · items i–vi, xi(b), xii, xiv, xv | B · vii–ix, xi(a), xiii* | C · unsecured retail | D · xi(c), xi(d) |
|---|---|---|---|---|
| 0–1 year | 25 / 40 | 10 / 25 | 25 | 15 / 25 |
| 1–2 years | 40 / 100 | 20 / 100 | 100 | 25 / 100 |
| 2–3 years | 55 / 100 | 30 / 100 | 100 | 40 / 100 |
| 3–4 years | 75 / 100 | 40 / 100 | 100 | 55 / 100 |
| After 4 years | 100 / 100 | 100 / 100 | 100 | 100 / 100 |
*For scheme-guaranteed exposures the second rate applies to the unsecured and unguaranteed portion. “Secured” means realistically realisable tangible security with valid recourse. Stage 3 floors are applied account by account.
Rules carried over
- NPA backstop: more than 90 days overdue for term loans, with product-specific tests such as crop seasons for farm credit.
- Borrower-level NPA: if one facility of a borrower is NPA, the borrower’s other facilities are NPA too. Do not assume every Stage 2 signal spreads the same way.
- Existing NPAs: accounts that are NPA on 31 March 2027 are not upgraded merely because the new framework starts.
- Natural-calamity restructured standard advances (item xiv): 5% Stage 1 and 10% Stage 2.
New ECL disciplines
- SICR: more than 30 days past due is a rebuttable presumption; a rating downgrade or covenant breach can move a current account to Stage 2.
- Regulatory parameters: 12-month PD floor 0.03%; fallback LGD 65% secured, 70% unsecured, 30% for specified eligible collateral (paras 96–98).
- Income: EIR on gross carrying amount in Stages 1–2; credit-impaired and POCI assets on cash basis only (para 115). EIR on all loans from 1 April 2030.
- Governance: Board oversight, independent validation, scenario documentation and fuller disclosures.