Outstanding debt: latest reported company snapshots
Research checked 8 November 2026 · US$ billions. Each row retains the issuer’s reporting date and measurement basis. Figures cover group-wide financing. Lease liabilities, commitments and subsequent financing require separate analysis. The table is a selection of verified disclosures, with no aggregate total.
| Company | Reporting date | Disclosed debt ($bn) | Measurement and source |
|---|---|---|---|
| Amazon | 30 Sep 2026 | 173.125 | Long-term debt balance-sheet line. Current debt and leases require additional reconciliation. Form 10-Q |
| Alphabet | 30 Sep 2026 | 125.100 | Disclosed carrying value of long-term debt outstanding. Form 10-Q |
| Meta | 30 Sep 2026 | 84.000 | Aggregate face principal of notes outstanding. Form 10-Q |
| Microsoft | 30 Sep 2026 | 35.481 | Current portion $4.391bn plus non-current debt $31.090bn. Quarterly balance sheet |
| CoreWeave | 30 Jun 2026 | 35.068 | Current and non-current recourse and non-recourse debt combined; leases excluded. Form 10-Q |
A common-date, all-in debt ranking requires reconciling current borrowings, carrying values, face principal and leases. Oracle is examined in the detailed sections below, including the $10bn issue completed on 4 November. New issuance and repayments after these balance-sheet dates change outstanding amounts. Bond trade prices and yields can be checked through FINRA Fixed Income Data and Cbonds when dated observations are accessible. No current trading quotes are included here.
A saver can own a broad equity index and a bond fund and still depend twice on the same AI investment cycle. The stockholder needs the new data centre to earn an attractive return. The bondholder needs the borrower to pay on time. A delay in selling compute can affect both, even while every scheduled coupon is paid.
What does a credit spread pay for?
A corporate bond yielding 7.851% against a comparable Treasury yielding 4.801% offers a 305 basis point spread. One basis point is 0.01 percentage point. Investors demand compensation for expected credit losses, uncertainty about those losses, trading liquidity and the supply of bonds they must absorb. A widening spread raises the required yield when the benchmark is unchanged, reducing the value of existing fixed coupons.
| Measure | How to use it |
|---|---|
| Treasury spread | Subtract the yield of a comparable government benchmark. Match currency and maturity. |
| Z-spread | Add a constant spread to each point on the spot curve until discounted contractual payments equal the observed price. |
| Option-adjusted spread (OAS) | Adjust for embedded options using a rate model. Useful when comparing callable bonds. |
| Credit default swap (CDS) | Premium for contractual default protection. Compare the same reference entity, tenor, seniority and currency across dates. Bond spreads and CDS can diverge because funding, liquidity and contract terms differ. |
Compare like with like. An index OAS, a new-issue Treasury spread and a five-year CDS quote answer different questions. A spread can rise because dealers need room for a large issue, because expected recovery fell, or because investors demand more compensation for uncertainty.
How much capital is involved?
| Measure | Date and scope | Interpretation |
|---|---|---|
| $296bn | Hyperscaler debt supply, 2026 year to early November, Goldman Sachs estimate | Gross issuance includes refinancing and general corporate borrowing. |
| $685bn | BofA forecast for AI-related credit-market issuance in 2027 | A forecast spanning credit channels. Counting it as realised investment-grade issuance inflates the total. |
| $81.7bn | US venture-backed borrowers through Q3 2026, all sectors | Large facilities can lift volume while fewer companies receive loans. The AI-only debt share requires separate data. |
| 148 bp vs 77 bp | BofA snapshot, 5 November 2026 | The AI investment-grade group traded 71 bp wider than the rest of the market. Ratings, duration and issuer mix influence this comparison. |
Debt issuance measures new funding. Outstanding debt measures what is still owed. Capex measures investment. A $1 billion loan used to construct a $1 billion building produces one financing transaction and one investment. Adding both double-counts the same activity.
Who owes the money?
| Structure | Repayment source | Where the loss can arise |
|---|---|---|
| Parent corporate bond | Group operating cash and refinancing | Capex exceeds recurring cash generation. Downgrades or expensive refinancing weaken debt service. |
| Project loan or private placement | Rent or contracted project cash after operating costs | Construction delay, cost overrun, power constraints, weak tenant or lease expiry before debt maturity. |
| GPU-backed equipment loan | Equipment rentals and proceeds from enforceable collateral | Chip obsolescence, correlated resale prices, removal costs and competing liens reduce recovery. |
| Venture debt | Startup cash, receipts and future financing | Revenue concentration, customer churn, cash burn and failure of the next equity round. |
| Securitised debt | A pledged pool of leases or receivables | Tranche priority, reserve accounts and common tenants determine which investors absorb losses first. |
Two real contracts. Alphabet disclosed a $5bn Waymo secured term loan at Term SOFR + 525 bp, due 2032, without an Alphabet parent guarantee. On $5bn fully drawn and unhedged, a 100 bp rise in SOFR adds $50m annual interest. At Meta’s Hyperion campus, the $27bn figure describes development cost. The Blue Owl joint venture has initial four-year Meta leases and conditional, capped residual-value support for 16 years. A lender must read the cap and triggers before assigning recovery value.
Which borrowers can fund the buildout?
| Borrower and date | Disclosed funding or cash profile | Credit question |
|---|---|---|
| Oracle · Aug 2026 quarter | $23.10bn operating cash flow, including $11.36bn of customer prepayments with a financing component. Cash capex about $28.5bn. | The $5.4bn gap after capex increases to $16.8bn if those advances are moved to a later quarter and capex stays fixed. How tightly are the cash flows matched? |
| Microsoft · Sep 2026 quarter | $58.0bn operating cash flow and $39.4bn cash capex left $18.6bn free cash flow. | How much future lease service accompanies cash purchases? |
| Meta · Sep 2026 quarter | $32.79bn operating cash flow and $34.91bn capex including finance-lease principal. $84bn notes outstanding at quarter end. | How much liquidity remains after contractual payments? |
| Amazon · 12 months to Sep 2026 | Free cash outflow of $42.36bn, versus a $14.79bn inflow one year earlier. | When will incremental capacity earn cash? This is a twelve-month measure. |
| Alphabet · Sep 2026 | $125.1bn carrying value of long-term debt. $130.5bn of undiscounted future payments on uncommenced leases. | How much fixed capacity has already been contracted? These amounts have different measurement bases. |
| CoreWeave · Jun 2026 | $35.07bn debt excluding leases, $7.51bn current debt and $5.52bn unrestricted cash. | Cash covered about 74% of current debt. Collections, available facilities and recourse determine the remainder. |
These figures cover the reporting entities’ wider businesses. They cannot be summed into an AI-only debt total.
Case 1 · Price Oracle’s five bond tranches
Oracle closed a $10bn financing on 4 November 2026. Comparing the five bonds controls for issuer and issue date while exposing the effects of tenor and the Treasury curve. These are issue terms. A secondary-market buyer needs a dated executable price.
| Due | Face ($bn) | Coupon | Issue yield | Treasury spread |
|---|---|---|---|---|
| 2029 | 2.00 | 7.000% | 7.062% | 240 bp |
| 2031 | 1.75 | 7.450% | 7.464% | 275 bp |
| 2033 | 2.25 | 7.850% | 7.851% | 305 bp |
| 2037 | 2.50 | 8.000% | 8.015% | 310 bp |
| 2046 | 1.50 | 8.650% | 8.667% | 335 bp |
Annualised contractual coupon cash totals $776.75m. Investors received an extra 95 bp of spread on the 2046 tranche over the 2029 tranche. The longer bond also leaves more future coupons and principal exposed to changes in discount rates.
Reprice the 2033 bond. At issue, discount fourteen semiannual coupons of $3.925 and $100 principal at 7.851% compounded semiannually. Hold time fixed and assume payment at maturity. Move the two sliders separately to see when a Treasury rally offsets spread widening.
Yield 8.851% · Price $94.859 · Change −5.14%
At +200 bp of spread and unchanged Treasury yield, price falls to $90.049, about 9.95% below issue. A 100 bp Treasury rally and a 100 bp spread widening offset each other in this single-yield calculation. Actual curve shifts, accrued interest and call-option value can change the result.
Excel replication: =PRICE(DATE(2026,11,4),DATE(2033,11,4),7.85%,8.851%,100,2,0)
How far did Oracle’s five-year CDS widen?
Buying a credit default swap buys protection against specified credit events. The table tracks selected execution-day median spreads on Oracle senior USD contracts with about five years remaining. Each change compares the dates printed in the table. Sparse trading and changes in the benchmark contract limit precision.
| Execution date | Reported spread | Move since prior row | Trades reporting a spread |
|---|---|---|---|
| 26 Jun 2025 | 37.5 bp | Baseline | 1 |
| 17 Dec 2025 | 156.0 bp | +118.5 bp | 1 |
| 31 Mar 2026 | 190.0 bp | +34.0 bp | 2 |
| 11 Sep 2026 | 180.0 bp | −10.0 bp | 10 |
| 20 Oct 2026 | 342.5 bp | +162.5 bp | 1 |
| 30 Oct 2026 | 293.0 bp | −49.5 bp | 2 |
| 5 Nov 2026 | 305.0 bp | +12.0 bp | 3 |
From 37.5 to 305 bp: +267.5 bp. On $10m of protection, the annualised spread-equivalent cost rose from $37,500 to $305,000, an increase of $267,500. Actual standard CDS settlement combines a fixed running coupon with an upfront payment. The 20 October reading came from one explicit spread observation; protection had tightened by 37.5 bp from that print by 5 November. The 6 November tape contained no explicit spread. The separate 305 bp on Oracle’s 2033 bond was its seven-year issue spread over Treasuries.
Download the underlying dated observations · DTCC-based series and methodology
Ten years of Oracle cash flow: when did capex overtake collections?
In FY2017, Oracle collected $14.126bn in cash from operations and invested $2.021bn in capital assets. By FY2026, operating cash flow had more than doubled, but capex was over 27 times its FY2017 level. The first annual funding gap in this ten-year window appeared in FY2025; it widened sharply in FY2026.
US$ billions · fiscal years ended 31 May
At the right edge, the vertical gap is $23.69bn: Oracle generated $31.98bn in operating cash and spent $55.66bn on capital assets.
| Year to 31 May | Operating cash flow ($bn) | Cash capex ($bn) | Free cash flow ($bn) | Capex / operating cash flow |
|---|---|---|---|---|
| FY2017 | 14.126 | 2.021 | 12.105 | 14.3% |
| FY2018 | 15.386 | 1.736 | 13.650 | 11.3% |
| FY2019 | 14.551 | 1.660 | 12.891 | 11.4% |
| FY2020 | 13.139 | 1.564 | 11.575 | 11.9% |
| FY2021 | 15.887 | 2.135 | 13.752 | 13.4% |
| FY2022 | 9.539 | 4.511 | 5.028 | 47.3% |
| FY2023 | 17.165 | 8.695 | 8.470 | 50.7% |
| FY2024 | 18.673 | 6.866 | 11.807 | 36.8% |
| FY2025 | 20.821 | 21.215 | -0.394 | 101.9% |
| FY2026 | 31.977 | 55.663 | -23.686 | 174.1% |
Each dollar of operating cash supported about 14 cents of capex in FY2017, $1.02 in FY2025 and $1.74 in FY2026. Above $1, the business must draw on liquidity or another funding source to cover investment. This calculation precedes dividends, acquisitions and debt principal repayments.
How did the recent buildout compare with the earlier business?
| Period | Average annual operating cash ($bn) | Average annual capex ($bn) | Average annual FCF ($bn) | Share of operating cash invested |
|---|---|---|---|---|
| FY2017–FY2021 | 14.62 | 1.82 | 12.79 | 12.5% |
| FY2022–FY2024 | 15.13 | 6.69 | 8.44 | 44.2% |
| FY2025–FY2026 | 26.40 | 38.44 | -12.04 | 145.6% |
The last column divides total capex by total operating cash for each period. The periods describe the spending pattern. Cash capex covers Oracle’s entire business, including shared cloud capacity; the filings do not isolate an AI-only series. FY2022 also included litigation-related cash payments. Oracle attributes the latest quarterly capex increase primarily to data-centre expansion.
In the next reported quarter, ended 31 August 2026 (Q1 FY2027), operating cash flow was $23.10bn and capex about $28.50bn, leaving a roughly $5.40bn deficit. Customer advances contributed $11.36bn to operating cash that quarter. Comparing collections, construction milestones and interest payments is more informative than annualising that single quarter.
Historical statements: FY2019 Form 10-K · FY2022 Form 10-K · FY2025 Form 10-K · FY2026 annual results
Why did Oracle’s free cash flow deteriorate?
Free cash flow here equals operating cash flow less cash capital expenditure. From FY2025 to FY2026, Oracle generated an additional $11.16bn from operations, but cash investment increased $34.45bn. That difference explains the $23.29bn deterioration. Borrowing helped fund the gap. It enters the financing section of the cash-flow statement; interest paid on the borrowing can reduce operating cash flow in subsequent periods.
| US$ billions · years ended 31 May | FY2025 | FY2026 | Change |
|---|---|---|---|
| Operating cash flow | 20.821 | 31.977 | +11.156 |
| Cash capital expenditure | 21.215 | 55.663 | +34.448 |
| Free cash flow | −0.394 | −23.686 | −23.292 |
| Proceeds from notes, term loans and other borrowings, net of issuance costs | 19.548 | 46.093 | +26.545 |
| Principal repaid on those borrowings | 15.841 | 6.942 | −8.899 |
| Cash dividends paid | 4.743 | 5.787 | +1.044 |
Interest paid is already reflected in operating cash flow under US GAAP. Deducting it again would double-count the burden. Principal repayments and dividends are additional calls on liquidity outside this FCF measure. In FY2026, the FCF deficit plus cash dividends required $29.47bn before principal repayments or other financing flows.
| Credit concern | Evidence or sensitivity | What to watch |
|---|---|---|
| Interest burden | August-quarter interest expense rose from $923m to $1.428bn year on year, up $505m or about 55%. | Compare operating earnings with interest expense, then reconcile expense to cash interest paid. |
| Future coupon burden | The November $10bn issue carries $776.75m of annualised gross coupons. | Net incremental cost depends on debt retired and the timing of issuance. |
| Customer advances | The August quarter included $11.36bn in customer prepayments with a financing component. | A delay in advances while construction bills fall due increases the funding gap. |
| Refinancing sensitivity | Illustrative: refinancing $5bn at a rate 200 bp higher adds $100m annual interest before tax. | Wider CDS or bond spreads affect funding costs when debt is raised or rolled. Existing fixed coupons stay contractual. |
The annual comparison identifies the source of the cash shortfall. The CDS history measures how investors priced protection. Their timing alone cannot establish what share of the spread move was caused by borrowing, capex or broader markets.
Oracle FY2026 results and comparative cash flows · August-quarter Form 10-Q and interest expense discussion
Alphabet: stronger collections, but a larger investment bill
Oracle’s funding gap has a parallel at Alphabet. In the first nine months of 2026, Alphabet generated more operating cash than a year earlier, yet capital expenditure more than doubled. Spending on servers, network equipment and data centres pushed investment above operating cash generation.
| US$ billions · nine months ended 30 September | 2025 | 2026 | Change |
|---|---|---|---|
| Operating cash flow | 112.311 | 127.149 | +14.838 |
| Cash capital expenditure, rounded | 63.600 | 132.000 | +68.400 |
| Calculated free cash flow, approximate | 48.711 | −4.851 | −53.562 |
| Capex / operating cash flow | 56.6% | 103.8% | +47.2 percentage points |
The bridge is straightforward. An extra $14.84bn of operating cash could fund only part of the extra $68.40bn of capex. Free cash flow consequently fell by about $53.56bn. This comparison uses matching nine-month periods. The capex figures are rounded as disclosed, making the calculated FCF figures approximate.
| What changed? | Credit implication | Shareholder implication |
|---|---|---|
| Cash capex exceeded operating cash by about $4.85bn | Funding must come from available liquidity or external capital before distributions and other cash uses. | Less internally generated cash remains for buybacks and dividends. |
| Long-term debt carrying value reached $125.1bn at September 2026 | Check interest coverage, maturity dates, covenant terms and refinancing spreads. | Future interest consumes part of the cash available to equity holders. |
| Uncommenced leases carry $130.5bn of undiscounted future payments | Capacity commitments create cash requirements as leases begin between 2026 and 2031. | Flexibility depends on contract terms and the returns earned on committed capacity. |
Borrowing proceeds enter financing cash flow and help meet the spending requirement. Interest paid can reduce operating cash flow, while principal repayment creates a separate financing outflow. The operating-cash and capex bridge quantifies the observed FCF deterioration. Attributing a particular share of that decline to debt interest requires a separate cash-interest reconciliation.
For both Oracle and Alphabet, the credit question is when new capacity will convert into repeat cash collections. A slower ramp can leave financing costs running ahead of receipts. Equity value depends on whether future cash returns compensate for the cost of funding and replacement investment. Their reported deficits cannot be compared directly: Oracle’s discussion uses a May fiscal year and an August quarter, while Alphabet’s table covers January through September.
Alphabet September 2026 Form 10-Q · cash flows, debt and lease commitments
GPU-backed loans: a financing option for AI infrastructure
A GPU loan finances the purchase of graphics processing units—the chips used to train and run AI models.
For example, an AI cloud company buys $100 million of GPU servers, contributes $30 million of equity and borrows $70 million. It rents computing capacity to customers and uses those receipts to pay interest and repay principal.
| Element | How it works |
|---|---|
| Borrower | An AI cloud provider or data-centre operator |
| Security | May include GPU servers, customer receivables and pledged bank accounts |
| Repayment source | Cash collected from customers using the computing capacity |
| Main risks | Low utilisation, falling rental prices, customer default and rapid chip obsolescence |
| Recovery after default | Depends on enforceable security rights and the GPUs’ resale value after costs |
“GPU-backed loan” is the clearer term when the equipment serves as collateral. The loan documents determine exactly which assets and cash flows lenders can claim.
This applies equipment-backed lending to AI computing capacity. The financing links loan repayment to customer demand and collateral recovery to rapidly changing chip technology. Explore the GPU-loan stress and recovery example.
Case 2 · Stress a GPU loan
Illustrative project: annual cash available for debt service is $24m, scheduled interest and principal are $18m, and debt service coverage is 1.33×. A delayed tenant ramp cuts available cash to $15m. Coverage falls to 0.83× and the project needs $3m from reserves or other funding. A signed contract only helps if payment begins before debt service falls due.
Suppose the senior loan balance at default is $60m. A forced GPU sale brings $44m and removal and enforcement cost $5m. With a perfected first lien and no prior claims, lenders recover $39m, or 65%. Loss given default is 35%. At an assumed one-year default probability of 4%, illustrative expected loss is 4% × 35% × $60m = $840,000. A model-implied probability inferred from a market spread would additionally reflect risk premia and liquidity.
Check insurance, equipment serial numbers and control rights, assignability of power and lease contracts, replacement-chip prices and time to liquidation. In a sector-wide sell-off, borrower default and weak collateral prices can occur together.
How should a venture lender price the loan?
Start with monthly cash burn after compute costs. A startup with $18m of unrestricted cash and $1.5m monthly burn has 12 months of runway. If it draws a $12m loan at an illustrative 10% coupon, cash rises to $30m and monthly interest to $0.1m. During interest-only months, simple runway becomes 18.75 months. If principal amortises over 36 months after month 12, the initial monthly principal bill adds roughly $0.33m. A lender should forecast that step-up explicitly.
A facility sized at 30–50% of annual recurring revenue or 20–35% of the last equity round can be tested as a term-sheet assumption. Underwrite churn, gross margin after inference costs, committed versus drawn amount, holdbacks and liquidity covenants. SOFR plus a margin gives a floating coupon; floors, fees, exit payments and warrants affect the effective cost. Warrant coverage expressed as a share of loan principal differs from a percentage of fully diluted equity. SaaS renewal pricing and AI substitution belong in borrower-specific downside cases.
Case 3 · Is the retirement portfolio diversified?
On 30 October 2026 information technology accounted for 37.4% of the S&P 500. Sector labels miss part of the economic exposure: Amazon falls under consumer discretionary, while Alphabet and Meta fall under communication services. The figure neither measures the AI share of the index nor the share of a typical retirement account. Retirement savers hold different funds, glide paths and allocations.
Consider an illustrative $100,000 account with $60,000 in an equity index fund, $30,000 in a bond fund and $10,000 in cash. Assume the selected AI-sensitive issuers represent 25% of that equity fund and 15% of that bond fund. Look through each holding before combining exposures.
| Sleeve | Exposed holding | Stress assumption | Loss |
|---|---|---|---|
| Equity | $60,000 × 25% = $15,000 | Shares decline 30% | $4,500 |
| Credit | $30,000 × 15% = $4,500 | Spread duration 6 years; spreads widen 150 bp | ≈ $405 |
| Cash and remaining positions | $80,500 | Held flat to isolate the common shock | $0 |
Combined loss ≈ $4,905, or 4.91% of the account. Credit loss here is a mark-to-market estimate: $4,500 × 6 × 0.015. There is no assumed default. Treasury duration, convexity, fund turnover and withdrawals would affect an actual outcome. An equity fall does not mechanically determine a spread move.
For a real account, multiply each fund’s portfolio weight by its security weights, combine share classes and aggregate debt and equity by issuer. Then map common customers, cloud providers and power suppliers. Check the dated holdings of a target-date fund’s underlying funds. For retirees taking withdrawals, a forced sale during a drawdown leaves fewer units to participate in a recovery. A national count of affected savers would require account-level holdings data.
What would signal a deterioration?
| Watch | Why it matters |
|---|---|
| Spread versus rating- and duration-matched peers | Persistent widening across outstanding bonds is stronger evidence of issuer repricing than a single new-issue concession. |
| Cash interest cover and maturity ladder | Use EBIT divided by interest for earnings cover; reconcile cash, committed liquidity, principal due and maintenance capex by date. |
| Refinancing and downgrade risk | Rolling $1bn at 200 bp extra adds $20m annual interest. Crossing an index rating threshold may also change the investor base. |
| Liquidity and private valuations | Check trade size, bid–ask spread, stale marks and exit restrictions. Smooth reported returns can mask changes in realisable value. |
| Portfolio spread duration | Approximate portfolio impact by summing weight × spread duration × spread shock across affected holdings. Stress Treasury yields separately. |
| Credit model and operational risk | Predictive tools flag missed receipts, utilisation declines and runway erosion. Test out-of-sample accuracy, drift, privacy and false positives. Covenant changes require the contractual approvals. |
AI in collections is a separate application. Precedence Research estimates a $3.22bn global market in 2026 and forecasts 15.05% annual growth through 2035. This is a commercial market estimate for software and services. It supplies no evidence about realised recovery rates on AI infrastructure loans.
Sources and calculation notes
- Oracle pricing term sheet · benchmark yields, spreads and call terms
- Oracle closing filing · 4 November
- Oracle · August quarter cash flow
- Microsoft · September quarter earnings call
- Alphabet · September Form 10-Q and Waymo loan
- Meta · September Form 10-Q
- Meta · Hyperion joint venture terms
- Amazon · September quarter results
- CoreWeave · June Form 10-Q
- MarketWatch · BofA and Goldman estimates, November 2026
- Venture debt · summary of PitchBook–NVCA figures
- S&P Dow Jones Indices · S&P 500 sector weights
- Precedence Research · debt collection forecast
Snapshot dated 8 November 2026. Project, venture and retirement examples use hypothetical inputs. The Oracle lab uses historical issue terms and assumes full contractual payment.
Vocabulary: terms used in this guide
Use this reference alongside the examples. One basis point equals 0.01 percentage point; 100 basis points equal one percentage point.
| Term | Meaning | How to read it in this article |
|---|---|---|
| AI | Artificial intelligence. | The investment theme driving demand for compute capacity. |
| GPU | Graphics processing unit. | A processor used for parallel computation, including training and running AI models. Its resale value affects equipment-loan recovery. |
| Compute | Processing capacity supplied by chips and servers. | Revenue depends on demand, pricing and actual utilisation of that capacity. |
| Hyperscaler | A provider operating cloud or digital infrastructure at very large scale. | The label alone says little about a borrower’s repayment capacity. |
| Capex | Capital expenditure. | Cash spent on long-lived assets such as servers and data centres. Cash capex differs from investment acquired through leases. |
| Operating cash flow (OCF) | Net cash generated by operating activities. | Collections after operating cash payments and working-capital changes. Under US GAAP, interest paid generally enters this measure. |
| Free cash flow (FCF) | In this guide, operating cash flow less cash capex. | A negative figure creates a funding requirement before dividends and debt principal payments. Check each company’s own definition. |
| Working capital | Operating current assets and liabilities, with definitions varying by context. | Receivables, payables and customer advances influence the timing of operating cash. |
| Customer prepayment | Cash received before delivering goods or services. | It helps finance construction today while creating a future delivery obligation. |
| Principal / face value | The contractual amount on which bond interest is calculated and that is repayable under the terms. | Market price and accounting carrying value can differ from face value. |
| Carrying value | The debt amount recorded in the accounts. | Issue discounts, premiums and financing costs can make it differ from face principal. |
| Coupon | Contractual bond interest rate applied to face value. | A fixed coupon remains fixed when the bond’s market yield changes. |
| Yield to maturity (YTM) | The discount rate equating contractual cash flows to the bond’s price. | It assumes scheduled payments. Realised return also depends on reinvestment, default and the sale date. |
| Treasury benchmark | A comparable US government security used as a rate reference. | Match currency and maturity when calculating a credit spread. |
| Credit spread | Extra yield relative to a chosen benchmark. | It reflects credit risk, liquidity, supply and investors’ required compensation. |
| Basis point (bp) | One hundredth of a percentage point. | A move from 200 bp to 300 bp is a 100 bp widening. |
| Z-spread | Zero-volatility spread. | The constant spread added to every spot-curve discount rate to match the bond’s observed price using its contractual cash flows. |
| Option-adjusted spread (OAS) | A model-based spread adjusted for embedded options. | Useful for comparing callable bonds; results depend on the option and interest-rate model. |
| Credit default swap (CDS) | A derivative transferring specified reference-entity credit-event risk. | The protection buyer pays a premium. Payment depends on contract-defined credit events and settlement terms. |
| CDS upfront payment | Cash paid at inception alongside a standard running coupon. | The fixed coupon alone does not reveal the market cost of protection. |
| Spread widening / tightening | An increase / decrease in required spread. | With other inputs held fixed, widening reduces a fixed-rate bond’s market price. |
| Spread duration | Approximate percentage price sensitivity to a one-percentage-point spread change. | A spread duration of six implies roughly a 6% loss for 100 bp widening, before convexity. |
| Duration | A measure of cash-flow timing or price sensitivity, depending on the definition. | Modified duration approximates price sensitivity to yield; distinguish it from spread duration. |
| Convexity | The curvature of the bond price–yield relationship. | It improves the duration approximation for larger yield moves. |
| Mark-to-market loss | A fall in value at current market prices. | It can occur while the issuer continues paying coupons and principal on schedule. |
| Investment grade (IG) | A credit-rating category generally BBB−/Baa3 or higher. | Ratings indicate assessed credit quality and can change. |
| Refinancing risk | The risk that maturing debt cannot be replaced on acceptable terms. | A higher spread can raise interest costs when debt is rolled. |
| SOFR | Secured Overnight Financing Rate. | A US dollar overnight funding benchmark. Term SOFR is a forward-looking term reference used in some loan contracts. |
| Senior / secured | Seniority describes payment priority; security gives claims over specified collateral. | Read guarantees, liens and exclusions to establish the lender’s actual rights. |
| Recourse / non-recourse debt | Debt with claims against the specified borrower more broadly / claims limited mainly to specified project assets and cash flows. | Guarantees, exceptions and legal entities determine the enforceable exposure. |
| Collateral / lien | An asset supporting repayment / a legal security interest in that asset. | Recovery depends on priority, enforceability and net sale proceeds. |
| Covenant | A contractual borrower obligation or restriction. | A breach can trigger remedies, negotiations or accelerated repayment under the agreement. |
| Debt service / DSCR | Scheduled interest and principal / debt service coverage ratio. | Cash available for debt service divided by scheduled debt service. Below 1× indicates a cash shortfall. |
| PD / LGD / EAD | Probability of default / loss given default / exposure at default. | Expected loss is often expressed as PD × LGD × EAD over a consistent horizon. |
| Recovery rate | The share of the lender’s exposure recovered after default. | Recovery costs, timing and claim priority affect the realised amount. |
| ARR / SaaS | Annual recurring revenue / software as a service. | Recurring revenue must be assessed alongside churn, margins and cash collections. |
| Venture debt / warrant | Lending to venture-backed firms / a right to buy equity on specified terms. | Warrants add equity participation to the lender’s return and can dilute shareholders. |
| Interest-only period / amortisation | A period paying interest without scheduled principal / gradual repayment of principal. | Debt service rises when principal amortisation starts. |
| PPA | Power purchase agreement. | Its price, duration and transferability influence a data centre’s economics. |
| Residual-value guarantee | Conditional support tied to an asset’s value at a future date. | Caps and triggers determine how much support a lender can rely on. |
| Tranche / securitisation | A class of financing / financing backed by a pool of assets or cash flows. | Payment priority determines how losses are allocated. |
| Dilution / buyback | A reduction in an existing holder’s ownership percentage from new issuance / a company’s repurchase of shares. | Funding choices change the cash and future earnings attributable to each share. |
| Cost of capital | The return required by providers of debt and equity. | Investment creates value when its risk-adjusted cash returns exceed this required return. |
| Look-through exposure | Exposure calculated from the underlying securities held by funds. | Different funds can hold the same issuers or depend on the same customers. |
| Glide path / sequence risk | A target-date fund’s changing allocation / the effect of return timing when money is withdrawn. | Losses early in retirement can force sales that leave fewer units for a recovery. |